The Maharashtra Prosperity Highway, widely known as Samruddhi Mahamarg, is set to witness temporary traffic stoppages in parts of Amravati district from 9 January to 13 January 2026. The Maharashtra State Road Development Corporation (MSRDC) has announced this regulation to carry out essential infrastructure upgrades aimed at improving highway safety and traffic management.
Why Traffic Will Be Stopped on Samruddhi Mahamarg
MSRDC is undertaking the construction of a gantry system under the Highway Traffic Management System (HTMS). Gantries play a crucial role in modern expressways by supporting:
- Traffic surveillance systems
- Digital information boards
- Speed and lane monitoring
- Emergency response coordination
This work is part of the long-term plan to make Samruddhi Mahamarg a smart, safe, and technology-driven expressway.
Work Schedule and Duration
- Dates: 9 January to 13 January 2026
- Total Phases: 10 phases
- Traffic Halt per Phase: Approximately 45 to 60 minutes
- Type of Closure: Lane-wise or channel-wise temporary stoppage
Traffic movement will resume immediately after the completion of each phase, ensuring minimal disruption.
Affected Locations in Amravati District
The gantry installation work will be carried out between:
- Km 90+500 to Km 150+300
- Near Dhamangaon Railway, Chandur Railway, and Nandgaon Khandeshwar taluka
This stretch is an important corridor for both passenger vehicles and commercial transport in Vidarbha.
Advisory for Vehicle Owners and Passengers
Due to the technical nature of the work, commuters may experience short delays during the active construction phases. Travelers are advised to:
- Plan their journeys in advance
- Allow extra travel time
- Follow instructions given by highway staff
- Maintain patience and adhere to safety guidelines
MSRDC has emphasized that these temporary measures are being taken in the interest of public safety and smoother future travel.
Long-Term Benefits for Highway Users
Although the temporary stoppage may cause inconvenience, the installation of the gantry system will provide long-term advantages such as:
- Better traffic regulation
- Enhanced road safety
- Faster accident detection and response
- Improved overall driving experience
These upgrades will further strengthen Samruddhi Mahamarg’s position as one of India’s most advanced expressways.
Conclusion
The temporary traffic halt on the Maharashtra Prosperity Highway from 9 to 13 January 2026 is a necessary step toward building a smarter and safer highway network. With proper planning and cooperation from travelers, the work can be completed efficiently, paving the way for improved infrastructure and seamless travel in the future.
